PCQI Insights

PCQI: Rice Noodle Cooling Controls and Qualified Facility Attestations

Rice noodle cooling controls start with your facility status under 21 CFR Part 117. Control the hazards of rice handling and cooling, monitor the right parameters and, where you are a qualified facility, submit the required attestations. PCQI duties depend on that status.

Rice noodle cooling controls and qualified facility attestations banner

Facilities that make refrigerated rice noodles or rice cakes need to understand their Part 117 obligations. A facility that qualifies for modified preventive controls requirements still has important CGMP duties. It may also have qualified facility attestation obligations.

This guide is for facility owners, PCQIs, food safety teams and refrigerated rice-food processors.

Six Areas to Review for Rice Noodle Cooling Controls

1. Determine facility status and scope

First, decide whether the facility follows the standard preventive controls requirements or the modified requirements of Subpart D. A qualified facility, as defined in 21 CFR 117.3, includes a very small business. Under 21 CFR 117.5(a), subparts C and G do not apply to a qualified facility, which instead follows 21 CFR 117.201.

Status is not permanent. Under 117.201(c), a facility must determine and document its status every year, no later than July 1.

2. Identify growth and toxin-formation hazards

Next, the hazard analysis under 21 CFR 117.130 should consider Bacillus cereus, Clostridium perfringens and Clostridium botulinum. Evaluate each one against the rice product, its packaging, storage and processing.

3. Design adequate cooling and holding controls

Assess the cumulative time-temperature exposure from processing through cold storage. Support the limits with product-specific scientific information.

Refrigeration is a process control under 21 CFR 117.135(c)(1). As appropriate, a process control must state the parameters that control the hazard and the maximum or minimum values for those parameters.

4. Examine reduced-oxygen packaging

Where reduced-oxygen packaging is used, determine whether additional barriers are needed for C. botulinum. Document the reasoning in the hazard analysis.

5. Address qualified facility attestations

Under 117.201(a), a qualified facility must submit two attestations. The first confirms its qualified facility status. The second states either that it has identified hazards and is implementing and monitoring preventive controls, or that it complies with applicable non-Federal food safety law.

Attestations are submitted electronically or on Form FDA 3942a. They are then resubmitted every two years between October 1 and December 31. In addition, the facility must keep the records that support its attestations.

6. Maintain verification and corrective action evidence

Finally, retain monitoring results and investigate deviations. Assess affected lots, follow the corrective action steps in 21 CFR 117.150 where they apply, and document control effectiveness and any needed reassessment.

Rice Noodle Cooling Controls Checklist

✓ Confirm the products, intended use, regulatory scope and current process flow.
✓ Review the hazard analysis against actual time-temperature exposure and packaging.
✓ Verify scientifically justified process criteria, monitoring methods and records.
✓ Identify and assess deviations, affected lots and any required corrective action.
✓ Confirm management oversight, ongoing verification and record availability.

Frequently Asked Questions

Does qualified facility status eliminate CGMP requirements?

No. The applicable CGMP requirements still apply, even where modified preventive controls requirements are available.

What is the qualified facility attestation?

Under 21 CFR 117.201, a qualified facility must submit an attestation of its status and a second, accompanying attestation. Both are subject to the timing and record rules in that section.

Does every rice noodle manufacturer need a PCQI?

Not necessarily. Whether specific PCQI provisions apply depends on the facility status and the relevant preventive controls requirements.

How PCQI Services Can Help

PCQI Services can support Part 117 applicability and qualified facility readiness reviews, hazard analysis and food safety plan work, and preventive control planning. Support also covers cooling process assessment and monitoring or verification procedures. Work is scoped to the product, the facility and the agreed engagement.

You may also create a SystemsBuilder account to organize supplier, product, process, monitoring and corrective action documentation, according to the platform features and subscription terms that apply to your account.

PCQI Insights

Related Reading

Need Help Managing Your PCQI Responsibilities?

Discuss your food, process, documentation and improvement priorities with our team.

Request a Free Consultation

Independent educational content. PCQI Services is not affiliated with or endorsed by the U.S. Food and Drug Administration (FDA) or any company referenced in regulatory materials. This content is for general information only and is not regulatory approval, certification or legal advice. Regulatory applicability must be assessed for each product, facility and operation. Read our terms.

Scroll to Top