PCQI Insights
Documenting Qualified Facility Attestation Status Under FSMA
Quick answer: your qualified facility attestation status should rest on a documented determination, not on your size or a past filing. Under 21 CFR 117.201, a facility determines and documents its status every year and submits the attestation every two years, during the October 1 to December 31 period. Keep that evidence separate from your registration renewal records.
Some facilities qualify for modified preventive controls requirements. Many of them must submit a qualified facility attestation (QFA) to FDA during the 2026 biennial period. However, qualification should be established using the applicable regulatory criteria, and the decision should be written down.
This article focuses on the evidence: how to document your status so that the decision can be checked later. For the renewal itself, see our FDA food facility registration renewal 2026 guide.
What Qualified Facility Status Means
Under 21 CFR 117.3, a qualified facility is a very small business as defined in Part 117. A facility can also qualify through a two-part sales test based on sales to qualified end-users and total food sales. In both cases, sales by subsidiaries and affiliates count.
Under 21 CFR 117.5(a), subparts C and G of Part 117 do not apply to a qualified facility, except as provided in subpart E. Instead, the facility follows the modified requirements in 21 CFR 117.201. As a result, the standard food safety plan and PCQI duties in subpart C may not apply to a qualified facility.
Why the Attestation Needs Its Own Evidence
An attestation is separate from FDA Food Facility Registration renewal. Renewing the registration does not, on its own, show that the QFA obligation was met. In fact, FDA’s 2026 renewal reminder notes that a facility must have a valid food facility registration to submit its attestation.
Likewise, a facility should not use its small size or a prior attestation as the only basis for assuming that the current obligation is satisfied. Sales, ownership and affiliates can change between cycles.
Under 21 CFR 117.201(f), a qualified facility must keep the records it relied upon to support its attestations. These records are subject to the recordkeeping requirements of subpart F.
Annual Determination and 2026 Submission Timing
First, 117.201(c)(1) requires a facility to determine and document its status as a qualified facility on an annual basis, no later than July 1 of each calendar year.
Second, 117.201(c)(2)(ii) requires the attestations to be submitted to FDA every 2 years, during the period beginning on October 1 and ending on December 31. For 2026, this matches the registration renewal period, which closes on December 31, 2026.
Status changes have their own deadlines. For example, when a facility is no longer a qualified facility, it must notify FDA of the change using Form FDA 3942a by July 31 of the applicable calendar year.
Who Prepares the Evidence and Who Submits
Technical personnel, including a PCQI, may support the eligibility review. For instance, they can describe the products and activities at the site. Even so, the facility should keep its own records of the determination, the applicable submission and the confirmation.
Next, assign an authorized person to complete required submissions. That person may be different from the person who assembles the evidence, so record both roles.
Qualified Facility Attestation Status Checklist
✓ Review qualified facility eligibility against the current 21 CFR 117.3 criteria.
✓ Document the annual status determination and the data behind it.
✓ Distinguish the QFA from food facility registration renewal.
✓ Assign an authorized person to complete required submissions.
✓ Retain eligibility support and the 2026 submission confirmation.
Above all, keep the QFA file and the registration file apart. Each one answers a different question.
Frequently Asked Questions
Does renewing our FDA registration also cover our qualified facility attestation?
No. The attestation is a separate submission. FDA’s 2026 reminder says qualified facilities must submit their attestation during the same biennial period, and that a valid registration is needed to submit it.
Can we rely on the attestation from the last cycle?
Not by itself. Under 21 CFR 117.201(c)(1), status must be determined and documented every year. Therefore, document a current conclusion instead of assuming the earlier one still holds.
Which records should support the attestation?
Keep the records relied upon to support the attestation, as 21 CFR 117.201(f) requires. In practice, that means the eligibility data, the determination, the submission and the confirmation. A records platform such as SystemsBuilder can keep them in one place, but the facility still owns the decision.
PCQI Insights
Related Reading
FDA Food Facility Registration Renewal 2026
A biennial renewal guide for food manufacturers: window, DUNS, updates and records.
Read article →
Cooling Controls and Qualified Facility Attestations
How a PCQI looks at cooling preventive controls and qualified facility attestations.
Read article →
FDA Facility Registration Applicability Review
Map activities and exemptions before you collect 2026 renewal evidence.
Read article →
Need Help Preparing for the 2026 FDA Renewal?
Talk with our team about your qualified facility status, supporting records and 2026 readiness steps.
Independent educational content. PCQI Services is an independent food safety and regulatory compliance service provider. It is not affiliated with, endorsed by, or authorized to act on behalf of the U.S. Food and Drug Administration (FDA). This article is for general information only and is not legal advice or an official statement of FDA policy. Requirements may change, and applicability depends on each facility’s operations. Verify current requirements with official FDA sources and qualified regulatory professionals before making compliance decisions. Read our terms.
