PCQI Food Safety Plan Reanalysis After Process Changes

Quick answer: under 21 CFR 117.170, a covered facility must reanalyze its food safety plan at least every 3 years. It must also reanalyze sooner after certain changes, such as a significant process change. A PCQI must perform or oversee that reanalysis, and the decision needs documented evidence.

PCQI food safety plan reanalysis after process changes banner

Process changes are part of normal production. New equipment, a new supplier or a reformulated recipe can all change the hazard picture. The question is whether your food safety plan still fits the operation.

Reanalysis after process changes answers that question in writing. For manufacturers considering Walmart supply relationships, it also shows that controls work in practice and are backed by current records.

Walmart supplier requirements can differ by program, product and business relationship. They also change over time. So confirm current requirements with your Walmart contact before treating any practice here as a Walmart rule.

When Reanalysis After Process Changes Is Required

Under 21 CFR 117.170(a), you must reanalyze the food safety plan as a whole at least once every 3 years. In addition, 117.170(b) requires reanalysis of the whole plan, or the affected portion, in four situations:

✓ A significant change in activities creates a reasonable potential for a new hazard, or a significant increase in a known hazard.
✓ You become aware of new information about potential hazards associated with the food.
✓ An unanticipated food safety problem occurs, where appropriate under 117.150(b).
✓ A preventive control, a combination of controls or the plan as a whole is found to be ineffective.

FDA can also determine that reanalysis is necessary to respond to new hazards and developments in scientific understanding, under 117.170(f).

Evaluate Each Affected Control

Start with what actually changed. Then trace that change through the hazard analysis and every control it touches.

Common change points include ingredients, suppliers, equipment, packaging, intended use, production parameters, sanitation and allergen management. For example, a new shared line may raise an allergen cross-contact question that the old plan never addressed.

Next, document whether the current hazard analysis, preventive controls, monitoring and recall plan remain appropriate. Record the reasoning, not just the conclusion.

PCQI Oversight and the Written Record

A preventive controls qualified individual must perform or oversee the reanalysis under 117.170(e). This is also one of the PCQI tasks listed in 21 CFR 117.180(a).

Under 117.170(d), you must revise the written plan when a significant change creates a reasonable potential for a new hazard, or a significant increase in a known one. Otherwise, you must document the basis for concluding that no revisions are needed.

So record the assessment, the supporting evidence, the decisions and the dates. Keep the rationale for any part of the plan that stays unchanged.

Finish Before the Change Goes Live

Timing matters. Under 117.170(c), the reanalysis, and validation of any additional preventive controls as appropriate, must be completed before a change in activities becomes operative.

There is a limited exception. When needed to show that controls can be implemented as designed, it may be completed within 90 calendar days after production of the food first begins. A longer timeframe needs a written justification prepared or overseen by the PCQI.

Then update procedures, validation, forms, training and production records where necessary, and verify they are in use. In addition, use a controlled transition so old instructions or labels are not left in use after the change. Our guide to food safety plan change control covers that transition in more detail.

Customer and Certification Implications

A process change may affect more than the FDA plan. Check whether it also affects SQF, BRCGS or FSSC 22000 certification obligations, or Walmart customer communication requirements.

However, do not treat an internal PCQI review as Walmart acceptance or as formal certification approval. Each of those decisions belongs to a different party.

Reanalysis After Process Changes: Supplier Checklist

✓ Recognize events that require reanalysis, including significant process changes.
✓ Evaluate each affected hazard and control.
✓ Document PCQI performance or oversight of the reanalysis.
✓ Revise the plan, or record why no revision is needed.
✓ Complete implementation before relying on the revised plan.
✓ Review customer and certification implications.
✓ Confirm the applicable Walmart supplier program and product and facility requirements.
✓ Assign owners for documentation, follow-up actions and periodic review.

Frequently Asked Questions

How often must a food safety plan be reanalyzed?

At least once every 3 years under 21 CFR 117.170(a). Certain events, such as a significant process change or new hazard information, require reanalysis sooner.

Who must perform reanalysis after process changes?

A preventive controls qualified individual (PCQI) must perform or oversee it, under 21 CFR 117.170(e). The PCQI may be an employee or an outside qualified individual.

Does a completed reanalysis mean Walmart will accept the change?

No. Reanalysis addresses FDA requirements. Any Walmart notification or approval steps must be confirmed directly with your Walmart contact.

Official References

21 CFR Part 117 — Preventive Controls for Human Food (eCFR)
21 CFR 117.170 Reanalysis
21 CFR 117.180 Requirements applicable to a PCQI
FDA: FSMA Final Rule for Preventive Controls for Human Food
Walmart: Supplier Requirements

PCQI Insights

Related Reading

Need Help Managing Your PCQI Responsibilities?

Talk with our team about reanalysis decisions, PCQI evidence and change control records for your facility.

Request a Free Consultation

Independent educational content. PCQI Services is not affiliated with or endorsed by Walmart Inc. or the U.S. Food and Drug Administration (FDA). Walmart-specific supplier requirements must be confirmed directly with the relevant Walmart contact. Meeting FDA requirements or working with PCQI Services does not guarantee supplier acceptance. Regulatory applicability depends on the product, facility, activity and current law. This article is not legal advice. Read our terms.

Scroll to Top